Dorchester Housing Development

Dorchester Bioremediation Treatment Project

Client – Major House Builder

Principal Contractor – Ford Civil Engineering

Consulting Engineer – Ashdown Site Investigation

Location – Dorchester

Contract Value – £50K

Ash Remediation Management has completed another successful bioremediation contract for a major house builder at a site in Dorchester with approximately 3000 tonnes of hydrocarbon impacted soil undergoing treatment.

As with all bioremediation projects carried out by Ash Remediation Management, a treatability study was completed. This early stage analysis provides specific background information on the soil to undergo treatment and gives important details on how best to condition the soil to maximise the contaminant breakdown. Based upon the findings of this, soil was homogenised with compost and a precise blend of agricultural fertilisers before being placed within the bunded treatment bay.

Working closely with the client on what was a highly congested site, Ash Remediation Management achieved the desired target levels within the timescale and budget whilst maintaining a safe working environment.

Ash Remediation Management also worked in an advisory role to help ensure that the conditions of planning were fully implemented. The success of the project meant that the client could progress the construction works to their originally specified timescale.

Baglan Bay, Port Talbot

Groundwater Treatment Baglan Bay
Ash Remediation Management provided supervision and labour to assist the main contractor in some in-situ groundwater treatment. Ash Remediation Management responded quickly and all work exceeded the clients expectations.

Okehampton, Devon

Disposal of Contaminated Material Devon
Ash Remediation Management provided a turnkey package for small developer in Devon. Ash Remediation Management conducted a site investigation to establish the extent of contamination,
agreed a clean up criteria with the local authority and managed the off site disposal of the contaminated material.

Stobart Park, Widnes

Environmental Permit Management Widnes
Ash Remediation Management provided and managed the Environmental Permit requirements for a large earthworks contractor. Ash Remediation Management produced and submitted the required paperwork and completed the necessary environmental monitoring.

Trafford Park, Manchester

Remediation Treatment Manchester
Ash Remediation Management provided the supervision to oversee a combined remediation and earthworks programme. Ex-situ bioremediation and pump and treat water system were operational and owing to our experience in these remediation methods we were able to quickly and efficiently integrate into the management team.

Warren Farm, Wokingham

Geotechnical Testing Verification Wokingham
Ash Remediation Management conducted geotechnical testing to establish the foundation requirements of some proposed stables. The testing entailed on and off site (laboratory) assessments and Ash Remediation Management reported the findings along with recommendations to the client in a timely fashion.

Purley Way, Croydon

Well Installation Validation Permeable Reactive Barrier Croydon
Ash Remediation Management were awarded a twelve month contract to provide third party validation of a permeable reactive barrier. Working closely with the clients environmental consultant, Ash Remediation Management provided the information required to progress the regulatory process.

Reading Road, Winnersh

Groundwater Treatment Feasibility Study Winnersh
Ash Remediation Management carried out an in-situ groundwater treatment feasibility study. Ash Remediation Management promptly acquired and reported the data which allowed the client to make an informed decision on the purchase of the site.