North Shore

Groundwater Treatment PRB North Shore

Client – Homes and Community Agency

Principal Contractor – Lumsden and Carroll

Consulting Engineer – Halcrow

Location – Stockton-on-Tees

Contract Value – £400K

The North Shore project is located on the north bank of the River Tees adjacent to the Infinity Footbridge in Stockton-on-Tees. Diesel oil based contamination had been detected in the River Tees and investigation identified the source as a number of underground fuel tanks. The diesel was migrating through the groundwater and Ash Remediation Management installed a groundwater treatment barrier to sever the pollution linkage pathway.

Each barrier system installed by Ash Remediation Management is bespoke and numerous design parameters are taken into account prior to installation. Variables considered include its position and depth in relation to the contaminant source, treatment capabilities and design life. These important design decisions are augmented with groundwater modelling and column testing. Prior to the installation of the North Shore barrier, the final design was agreed with the consulting engineer and Environment Agency.

The resulting design was applied using the soil mixing capabilities of a piling rig. The treatment slurry was produced in an automated batching plant and delivered to the rig via a semi automated pumping system. As the auger rotated slurry was injected through the modified drilling head and mixed with the surrounding media. During the mixing process the rig’s on board computer generated real time drilling data which enabled the driver to ensure equal dispersion and homogenisation of the slurry. Drilling data was recorded daily and used in the quality control process.

On completion of installation the regulator approved monitoring scheme commenced. Monitoring wells upstream and downstream of the barrier were sampled for a period of two years. Upstream wells provided data on water quality impacting upon the barrier and those installed downstream illustrated the quality of water migrating through.

The monitoring demonstrated the success of the barrier system and the associated report produced by Ash Remediation Management was approved the Environment Agency.

The project was completed on time, on budget with a zero accident record.

Welling

Japansese Knotweed Treatment Welling

Ash Remediation Management successfully treated and removed Japanese Knotweed from a former industrial site in readiness for the development of a residential care home.

Stourbridge

Japanese Knotweed Removal Stourbridge

Ash Remediation Management have recently completed a treatment and long term maintenance scheme on behalf of a medium sized construction company.

Liverpool

Japanese Knotweed Treatment Liverpool

Ash Remediation Management were contacted by a landowner who suspected a Japanese Knotweed issue. Early intervention prevented further spread and the site was ‘Japanese Knotweed free’ after a single herbicide application.

Dudley

Japanese Knotweed Removal Dudley

Ash Remediation Management were commissioned by Dudley Metropolitan Borough Council to control Japanese Knotweed at a sports college.

 

Croydon

Eradication of Japanese Knotweed Croydon

Ash Remediation Management devised a successful treatment and long term maintenance programme to eradicate Japanese Knotweed from a housing development.

Brixton

Japanese Knotweed Removal Brixton London

Ash Remediation Management were contracted by a local authority in central London to control Japanese Knotweed at an infant school as part of a refurbishment contract.

 

Audley Gasworks

Chemical Stabilisation Treatment Audley

The former gasworks is located in Shropshire and it was purchased by a midlands based house builder. The site was polluted with typical gasworks contaminants (namely polycycic aromatic hydrocarbons (PAH), total petroleum hydrocarbons (TPH), lead and cyanide) and in order to comply with planning regulations a detailed remediation programme was undertaken.

Ash Remediation Management provided a full remediation scheme including chemical stabilisation/solidification, bioremediation and the removal of contaminated waters. This case study discusses the ex-situ bioremdiation aspect of the project.

Material undergoing ex-situ bioremediation was conditioned with agricultural fertilisers and compost. In order to control internal biopile conditions as well as environmental releases, a closed aeration system was utilised. Coupled to this was regular interpretive monitoring, used to optimise the efficiency of the biopile. A total of 1400m3 of material underwent a 15 week treatment programme and the bioremediated soils were used as subsoil in the residential and landscaped garden areas.

All phases of the project were achieved within budget and the bioremediation work was concluded 8 weeks inside the project deadline.

Reading

Japanese Knotweed Removal to Allow Ground Stabilisation Work

Ash Remediation Management assisted the client by treating and removing Japanese Knotweed contaminated soils to allow ground stabilisation works.