Burnley Gasworks

Gasworks Waste Disposal

As part of the remediation of a former gasworks site, Ash Remediation Management provided a cost effective disposal solution to a variety of typical gasworks wastes including tar, PAH, TPH and cyanide. All aspects of the disposal work was managed by Ash Remediation Management and the project ran smoothly and completed ahead of the schedule.

Recycling Centre, Kent

Contamination delineated material disposal

An employee at a recycling centre in the South East of England identified some suspect material on the companies premises. Ash Remediation Management carried out a site investigation and confirmed the presence of asbestos cement board and oil contamination. The contamination hotspot was delineated and the material was disposed of at an off site facility.

Reading

Japanese Knotweed Removal to Allow Ground Stabilisation Work

Ash Remediation Management assisted the client by treating and removing Japanese Knotweed contaminated soils to allow ground stabilisation works.

Oxford

Off Site Disposal Oxford

As part of a £400K earthworks package Ash Remediation Management removed in excess of 3500 tonnes of non-hazardous asbestos contaminated soils and hardcore.

Okehampton

Hazardous Soil Removed from Former Gasworks Okehampton

On a site where Ash Remediation Management was appointed the Principal Contractor, hazardous soil was removed from a former gasworks site. The material was sent to a treatment facility and completed the site remediation programme.

Matlock

Off Site Disposal Matlock

1100 tonnes of surplus soil was removed and used on a restoration site.

Malvern Gasworks

Gasworks Remediation Scheme Malvern

As part of a gasworks remediation scheme 1300 tonnes of hazardous soil was removed from site.

Gould Street Gasworks

Hazardous and non hazardous soil off site disposal - Gould Street Gasworks

As part of a £1M award winning remediation scheme for Ash Remediation Management, more than 5000 tonnes of hazardous and non-hazardous soils were removed from site.

Knebworth

Off Site Disposal of Hazardous Soil Knebworth

2500 tonnes of hazardous soil was quickly and efficiently transferred to a treatment facility enabling the client to keep to their development programme.